High-Rise Vertical Control Transfer delivering HIGH ACCURACY Control Network Frameworks across Projects, where ACCURATE VERTICAL ALIGNMENT IS CRITICAL.
At SurveyWorx we provide Expert Geospatial Engineering Solutions assisting our Clients to deliver High-Rise Buildings/Structures where large-scale complex Projects require HIGH ACCURACY POSITIONAL DATA during the Construction Phase.
Our Clients can be assured they have the guidance/support, coupled with accurate & reliable Geospatial Data delivered at critical stages of their Projects, ensuring complex designs can be delivered with confidence.
We employ the latest integrated Robotic Total Stations, GNSS, High-Precision Laser Zenith Plummets, Precision Digital Levels, Steel Tape Under Tension & “Robust Survey & Engineering Methods” to deliver & verify accurate Survey & Setting Out Data across Projects.
Engineering Methodology & Workflows
Vertical Control is transferred through High-Rise Buildings/Structures using a combination of Total Station (1” Arc) & HIGH ACCURACY Vertical Laser/Optical Zenith Plummets & Steel Tape Under Tension.
- Establish / Verify Primary Survey Control Networks
- Transferring the Zenith / Control
- Vertical Datum Transfer (Steel Tape)
- Set Out Gridline Intersections (Drill & Pin)
- Sub-Contractor Quality Assurance/Validation Works
SurveyWorx Quality Management System delivering QA/QC Setting Out Verification “As Set Out” Drawings & Reports.
DRIVE STRAIGHT VERTICAL High Accuracy Positional Data across complex Engineering Projects.
High-Rise Vertical Control Networks
Our Clients can be assured they have the guidance/support, coupled with accurate & reliable Geospatial Data delivered at critical stages of their Projects, ensuring complex designs can be delivered with confidence.
Vertical Control is transferred through High-Rise Buildings/Structures using a combination of Total Station (1” Arc) & Vertical Laser/Optical Zenith Plummets. At SurveyWorx we understand the limitations of using Retro Targets (External Targets) on surrounding Buildings during the Construction Phase, and we have developed Engineering Solutions to accurately deliver these Projects.
Transferring the Zenith / Vertical Plumbing Control
We provide Site Control in Arbitrary/Local Grid or Ordnance Survey National Grid (OSGB36) to Millimetre/Sub-Millimetre accuracies, resulting in high accuracy, quality & repeatability across your Project.
Vertical Control is transferred through High-Rise Buildings/Structures using a combination of Total Station (1” Arc) & HIGH ACCURACY Vertical Laser/Optical Zenith Plummets.
Instrument: GeoFennel FLP-150 Laser Plummet (Accuracy +/- 2.5mm at 100m).
Datum & Height Transfer – Vertical Transfer
Suspended Steel Tape under Tension Method.
Level Datums are Transferred to each Level using Suspended Steel Tape under Tension. The process is repeated on different Cores, after shifting the Steel Tape, allowing readings from a different section, thereby minimising the possibility of misreading values.
Level/Height Datums are established at Finished Floor Level (FFL) +1.000m. Establishing them at FFL +1.0m ensures that they are easy to Install, readily visible and easy to use by follow on Sub-Contractors & Trades.
Datums are always referenced to Site Bench Mark, Transferred at Ground Floor Level. All Height Information is referenced from BM to ensure Settlement does not affect Datums on upper levels as the Buildings/Structures rise throughout a Project.
Weekly/Monthly Checks/Verification are carried out between the External Primary Control (BM) & Site Bench Marks to Monitor Settlement across the Project.
Setting Out Verification QA/QC
We deliver Setting Out Verification “As Set Out” Drawings & Reports to document & highlight that all Setting Out has been completed as per Design Specifications assuring our Clients that highly accurate & reliable Survey Data has been provided throughout their Project.
Survey Data is Post-Processed in-house through the use of dedicated Survey Mapping Software & rigorous QA/QC procedures to ensure we deliver consistent & reliable results.
- Establish / Verify Primary Survey Control Networks
- Best Fit Architects Design Grid System to an existing Building/Structure
- Establish Gridlines, Datum’s & Finished Floor Levels (FFL’s) on Site
- Set Out Building/Structure Footings & Foundations
- Sub-Contractor Quality Assurance/Validation Works
Get in touch today to discuss your Project & let us deliver an efficient & cost-effective solution to all your High-Rise Vertical Control, Site Control & Setting Out requirements.
Trusted Geospatial Data
Planimetric & Vertical Control
“Delivering Highly Accurate Planimetric & Vertical Control Solutions”.
Comprehensive Control Network Frameworks of permanently fixed Survey Stations established on Site.
At SurveyWorx we deliver Survey Control across both small & large-scale Private Development Schemes, Urban Regeneration Schemes, National Road Projects & major Construction & Engineering Works.
Control Network Frameworks can be related to an Arbitrary/Local Grid or Ordnance Survey National Grid (OSGB36) to Millimetre/Sub-Millimetre accuracies, resulting in high accuracy, quality & repeatability across your Project.
Survey Methodology / Workflow & Delivery
Field Observations are Post-Processed through SCC Survey Software to apply a Least Squares Adjustment (& Scale Factor Correction if required). Adjusted Control Network Coordinates are analysed (Residuals, Standard Errors, Error Ellipses) to validate the final Control Network Coordinates.
- Control Station Location Drawings
- Station Coordinate Schedules
- Delivered in a variety of formats (*.TXT / *. CSV / *DXF)
Get in touch today to discuss your Project & let us deliver an efficient & cost-effective solution to all your Site Control & Setting Out requirements.